Bronfabrikant produceert sterke magneet zwarte epoxy blokmagneet permanente magneet Nd-Fe-B
Krachtige China Permanente magneet fabricage gesinterde ndfeb magneet,
1. Kernfilosofie van het bedrijf
Goede kwaliteit Goede prijs
2.Productdetail
Nd-Fe-B zeldzame aarde permanent magneetstaal
NdFeB technische prestatielijst
| Cijfer | Br | Hcj | Hcb | (BH)max | (TW) | ||||
|
| Mt | KG's | KOe | KA/m | KOe | KA/m | MGOe | kj/m³ | ℃ |
N
| N35 | 1180-1210 | 11.7-12.1 | ≥12 | ≥955 | ≥10,9 | ≥868 | 33-36 | 263-287 | 80 |
| N38 | 1210-1250 | 12.1-12.5 | ≥12 | ≥955 | ≥11,3 | ≥899 | 36-39 | 287-310 | 80 |
| N40 | 1250-1280 | 12.5-12.8 | ≥12 | ≥955 | ≥11,6 | ≥923 | 38-41 | 302-326 | 80 |
| N42 | 1280-1320 | 12.8-13.2 | ≥12 | ≥955 | ≥11,6 | ≥923 | 40-43 | 318-342 | 80 |
| N45 | 1320-1380 | 13.2-13.8 | ≥12 | ≥955 | ≥11,0 | ≥876 | 43-46 | 342-366 | 80 |
| N48 | 1380-1420 | 13.8-14.2 | ≥11 | ≥876 | ≥10,5 | ≥836 | 46-49 | 366-390 | 80 |
| N50 | 1400-1450 | 14.0-14.5 | ≥11 | ≥876 | ≥10,0 | ≥796 | 48-51 | 382-406 | 80 |
| N52 | 1420-1480 | 14.2-14.8 | ≥11 | ≥876 | ≥10,0 | ≥796 | 49-53 | 390-422 | 80 |
M | 35M | 1170-1210 | 11.7-12.1 | ≥14 | ≥1114 | ≥10,9 | ≥868 | 33-36 | 263-287 | 100 |
| 38M | 1210-1250 | 12.1-12.5 | ≥14 | ≥1114 | ≥11,3 | ≥899 | 36-39 | 387-310 | 100 |
| 40M | 1250-1280 | 12.5-12.8 | ≥14 | ≥1114 | ≥11,6 | ≥923 | 38-41 | 302-326 | 100 |
| 42M | 1280-1320 | 12.8-13.2 | ≥14 | ≥1114 | ≥12,0 | ≥955 | 40-43 | 318-342 | 100 |
| 45M | 1320-1380 | 13.2-13.8 | ≥14 | ≥1114 | ≥12,0 | ≥955 | 43-46 | 342-366 | 100 |
| 48M | 1360-1430 | 13.6-14.3 | ≥14 | ≥1114 | ≥12,9 | ≥1027 | 46-49 | 366-390 | 100 |
| 50M | 1380-1460 | 13.8-14.6 | ≥14 | ≥1114 | ≥12,9 | ≥1027 | 48-51 | 382-406 | 100 |
H | 33 uur | 1130-1170 | 11.3-11.7 | ≥17 | ≥1353 | ≥10,5 | ≥836 | 31-34 | 247-271 | 120 |
| 35 uur | 1170-1210 | 11.7-12.1 | ≥17 | ≥1353 | ≥10,9 | ≥868 | 33-36 | 263-287 | 120 |
| 38 uur | 1210-1250 | 12.1-1250 | ≥17 | ≥1353 | ≥11,3 | ≥899 | 36-39 | 287-310 | 120 |
| 40 uur | 1250-1280 | 12.5-12.8 | ≥17 | ≥1353 | ≥11,6 | ≥923 | 38-41 | 302-326 | 120 |
| 42 uur | 1280-1320 | 12.8-13.2 | ≥17 | ≥1353 | ≥12,0 | ≥955 | 40-43 | 318-342 | 120 |
| 45 uur | 1320-1360 | 13.2-13.6 | ≥17 | ≥1360 | ≥12,5 | ≥955 | 43-46 | 342-366 | 120 |
| 48 uur | 1350-1460 | 13,5-14,6 | ≥17 | ≥1360 | ≥12,5 | ≥955 | 46-49 | 366-390 | 120 |
SH | 33SH | 1130-1170 | 11.3-11.7 | ≥20 | ≥1592 | ≥10,6 | ≥844 | 31-34 | 247-271 | 150 |
| 35SH | 1170-1210 | 11.7-12.1 | ≥20 | ≥1592 | ≥11 | ≥876 | 33-36 | 263-287 | 150 |
| 38SH | 1210-1250 | 12.1-12.5 | ≥20 | ≥1592 | ≥11,4 | ≥907 | 36-39 | 287-310 | 150 |
| 40SH | 1250-1280 | 12.5-12.8 | ≥20 | ≥1592 | ≥11,8 | ≥939 | 38-41 | 302-326 | 150 |
| 42SH | 1280-1320 | 12.8-13.2 | ≥20 | ≥1600 | ≥11,8 | ≥939 | 39-43 | 310-342 | 150 |
| 45SH | 1310-1360 | 13.1-13.6 | ≥20 | ≥1600 | ≥12,0 | ≥955 | 42-45 | 334-358 | 150 |
UH | 30UH | 1080-1130 | 10.8-11.3 | ≥25 | ≥1900 | ≥10,2 | ≥812 | 28-31 | 223-247 | 180 |
| 33UH | 1130-1170 | 11.3-11.7 | ≥25 | ≥1900 | ≥10,7 | ≥852 | 31-34 | 247-271 | 180 |
| 35UH | 1180-1220 | 11.8-12.2 | ≥25 | ≥1990 | ≥10,8 | ≥860 | 33-36 | 263-287 | 180 |
| 38UH | 1210-1250 | 12.1-12.5 | ≥25 | ≥1990 | ≥10,6 | ≥844 | 36-39 | 287-310 | 180 |
EH | 28EH | 1040-1090 | 10.4-10.9 | ≥30 | ≥2388 | ≥9.80 | ≥780 | 26-29 | 207-231 | 200 |
| 30EH | 1080-1130 | 10.8-11.3 | ≥30 | ≥2388 | ≥10,2 | ≥812 | 28-31 | 223-247 | 200 |
| 33EH | 1130-1170 | 11.3-11.7 | ≥30 | ≥2400 | ≥10,5 | ≥835 | 31-34 | 247-271 | 200 |
| 35EH | 1160-1200 | 11.6-12.0 | ≥30 | ≥2400 | ≥10,6 | ≥835 | 33-35 | 263-279 | 200 |
3. Vacht
categorie | kleur | Platingdikte (UM) | Servicetemperatuur | Weerstand tegen zoute mist | ||
NICUNI | zilverachtig | 20-30 | ≤200℃ | > 72 uur | ||
NI | zilverachtig | 10-30 | ≤2000℃ | > 48 uur | ||
ZN | Blauw/kleur/zilverachtig/zwart | 10-20 | ≤160℃ | > 48 uur | ||
Epoxy | zwart | 10-30 | ≤120℃ | > 96 uur | ||
Chemisch nikkel | zilverachtig | 5-30 | ≤200℃ | > 200 uur |
5.Productdetail
6.Betaling & Levering
Betalingsvoorwaarden: 30% voor aanbetaling, 70% vóór verzending. (TT, Paypal L/C)
Pakketdetails: zeeverpakking, luchtverpakking, vacuümverpakking en neutrale verpakking
Levering: volgens de specificaties van de klant en de leveringsdatum van het kwantiteitsbudget, kan de levering over het algemeen 7-15 dagen duren.
7. Fabrieksuitrusting
8.Certificaat
9. Onze service
10.Veelgestelde vragen
(1) Wat zijn uw prijzen?
Vraag: We zullen de beste prijs berekenen op basis van de prestaties, specificatie, hoeveelheid en coating die u nodig heeft.
(2) Hoe lang duurt het om de leverdatum te produceren?
Vraag: We hebben 7-15 dagen voor levering van voorraadmaterialen en 20-25 dagen voor levering van bestelde materialen.
(3) Zijn jullie fabrieken?
Vraag: Ja, ons bedrijf heeft een fysieke fabriek.Klanten zijn welkom om onze fabriek op elk moment te inspecteren